Case studies

COOLTHERM FLIES HIGH WITH BESPOKE SOLUTION.

Overcoming logistical restraints to design and build a low noise chiller on the roof top of a Luxury London Hotel.

Read More

COOLTHERM INSTALLS INNOVATIVE WATER CHILLER TO PRESTIGIOUS BUILDING IN CENTRAL LONDON

Fitzwilliam House is a prestigious large scale ‘occupied’ commercial building which sits in the shadow of the Gherkin in central London and is the UK headquarters for several specialist  insurance companies.  Following construction three decades ago it found itself in need of  replacing its third generation of water chillers to serve the central air conditioning plant. 

Read More

COOLTHERM CONTINUES TO PUSH THE EFFICIENCY ENVELOPE FOR COLT’S PREMIER 5MW DATA CENTRE

Cooltherm was selected by Colt to replace 4 chillers that were proving to be inefficient and unreliable with very high operational and maintenance costs. 

Read More

NEW BBC WALES BUILDING COOLED BY CUTTING EDGE TURBOMISER CHILLERS

The BBC will shortly be moving from Llandaff to a new purpose built quarters for BBC Wales in Central Square Cardiff.

The building was designed by Sir Norman Foster and will be the focal point of the Central Square development. Turbomiser chillers supplied and installed by Cooltherm will deliver chilled water to the AHU’s providing the comfort cooling to the building, plus additional separate Turbomiser chillers will be covering the critical IT and studio cooling loads.

Read More

SHARPAK ENLISTS THE HELP OF COOLTHERM TO PROVIDE CUTTING EDGE LOW RUNNING COST TURBOMISER CHILLERS

Sharpak Bridgewater produce high-tech food packaging and specialise in the advanced packaging production for meat and the strict quality requirements of this industry.  Originally the site production line was served by four 100kw Bluebox chillers which after many years of service had become unreliable and required frequent repairs to maintain robust chilled water production. Following the installation in 2014 of a 1MW Turbomiser™ chiller elsewhere on the site, Sharpak once again turned to Cooltherm to see if they could offer a highly efficient solution. 

Read More

INNOVATIVE CHILLER REPLACEMENT PROJECT FOR THE UNIVERSITY OF SOUTHAMPTON

Cooltherm were selected to install two new Turbomiser™ water cooled chillers into a world leading research facility at Building 53 at the University of Southampton.  The University needed to replace its existing critical cooling plant as it was proving to be inefficient and unreliable, the chilled water system in Building 53 was the university’s single biggest user of energy out of the entire campus so it was imperative that the new equipment was efficient and  reliable.

Read More

AMCOR FLEXIBLES INSTALLS ANOTHER HIGH EFFICIENCY TURBOMISER CHILLER

Amcor Flexibles is a market leader in responsible global packaging solutions for the food, beverage, healthcare, home and personal care industries.
 
Cooltherm has worked with Amcor Flexibles for more than 25 years, installing and servicing 3 very large chillers at the company’s manufacturing facility on the outskirts of Bristol.
 
In its most recent project, Cooltherm worked closely with Amcor Flexibles to replace one of the existing water cooled chillers at the site, after it had reached the end of its operational life and become uneconomical to repair.
 

Read More

VODAFONE INSTALLS TURBOMISER TO MAKE SIGNIFICANT COST SAVINGS

Three Turbomiser air cooled water chillers are providing enhanced efficiencies and flexible cooling capacity at Vodafone’s Accenture test facility site in Newbury.      Vodafone is one of the world’s leading mobile communications providers.

Read More

COOLTHERM EQUIPS CARDIFF UNIVERSITY WITH HIGH EFFICIENCY MITSUBISHI CHILLER

A chiller replacement project for Cardiff University will massively reduce the carbon footprint of process cooling, resulting in  important energy cost savings.

Read More

HIGH EFFICIENCY TURBOMISER COOLING AT THE HEART OF GROUND-BREAKING WATER RECLAMATION PROJECT

A high efficiency Turbomiser chiller system supplied and commissioned by Cool-Therm is providing essential cooling for a ground-breaking water treatment and reclamation facility at a major UK food production plant.

Read More